Set targets and indicators: Revision history

Jump to: navigation, search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

18 June 2026

9 June 2026

8 June 2026

  • curprev 11:2011:20, 8 June 2026Admin talk contribs 10,363 bytes +1 No edit summary
  • curprev 10:1310:13, 8 June 2026Admin talk contribs 10,362 bytes 0 No edit summary
  • curprev 10:1210:12, 8 June 2026Admin talk contribs 10,362 bytes +10,362 Created page with "{{SumpStep/top|step=6|phase=2|title=Set targets and indicators}}<div class="sump-intro"> The vision and objectives agreed in the previous step say where the area wants to go. This step makes that ambition measurable. A target fixes how far and by when, and an indicator is the thing you will actually measure to know whether you are getting there. Without them a plan cannot be steered while it runs or judged once it ends, and the baseline you fixed back in Analyse_the_mo..."